Incidents, Messages, Orders, Etc.
|
1 September 1944 |
| 2 Miles SW of Manre |
|
H&S Co.
Staff and Service functions.
Co. A
Security for XX Corps Headquarters.
Co. B
Cleared mines, booby traps and ammunition for route GC-26
an vicinity so St. Leonard. Moving forward with Group column.
Co. C
Moved by motor convoy from 1 mile West of Somme Bionne
at 0730 hours and arrived at Charny at 1100 hours. |
|
| 2 September 1944 |
| 1 Mile SE of Nizeville |
|
H&S Co.
Departed 2 miles SW of Manre at 1520 hours by motor convoy
and arrived 1 mile SE of Nizeville at 1645 hours.
Co. A
Air Port construction at Le Misnil, SW of Chalowa for
use by heavy aircraft mission assigned by Corp Engineer.
Co. B
Departed area 1 ½ miles West of Somme Tourbe at
1430 hours by motor convoy and arrived at area 2 miles NE of Souhesmes
at 1715 hours.
Co. C
Maintaining Treadway bridge and approaches at Bras-pror.
Security for bridge equipment in RR yards at Verdun. Reld 160th Engineer.
GENERAL
Raining, cold, A Company has 1 officer (Pierce) and 2
EM missing in mission of advance Recon. for XX Corps. Letters and personal
equipment found at Menehould. |
|
| 3 September 1944 |
| 1 Mile SE of Nizeville |
|
H&S Co.
Staff and Service functions.
Co. A
Left Le-Mensil-Sur-Ogler at 1530 hours by motor march
and arrived 1 mile SE of Nizeville at 1800 hours.
Co. B
Departed area 1 ½ miles West of Somme Tourbe at
1430 hours by motor convoy and arrived at area 2 miles NE of Souhesmes
at 1715 hours.
Med. Det.
Departed from Somme Tourbe at 1600 hours by motor convoy
and arrived at present location at 1830 hours. |
|
| 4 September 1944 |
| 1 Mile SE of Nizeville |
|
H&S Co.
Staff and Service functions. Carrying on extensive reconnaissance
for availability of bridge materials for Co. B bridge job when needed.
Co. A
Providing security for railroad tunnel and supplies stored
in same location. Located at U326678.. Transporting bridge equipment for
99th Engineer.
Co. B
Assigned mission of constructing Class 40 two-way, class
70 one-way, bridge at site in Verdun, whenever construction becomes necessary.
Co. C
Located at Bras providing security and maintenance for
Treadway bridge at Bras and security for bridge equipment in railroad yards
at Verdun. |
|
| 5 September 1944 |
| 1 Mile SE of Nizeville |
|
H&S Co.
Staff and Service functions.
Co. A
Repairing and maintaining Route N-3 between St. Menhold
and Verdun to accommodate Class 70 traffic. Posted bridge signs as directed.
Co. B
Maintaining one security party at existing bridge in
Verdun during hours of darkness.
Co. C
Providing maintenance and security for treadway bridge
and approaches at Charny and security for RR Cars in yards at Verdun. |
|
| 6 September 1944 |
| 1 Mile SE of Nizeville |
|
H&S Co.
Staff and Service functions.
Co. A
Maintaining N-3 between St. Minihold and Verdun. Making
minor repairs to existing Truss bridges in Verdun providing security for
RR Tunnel at U326678.
Co. B
Repairing RR between Verdun and Chalons (relieved 160th
Engr.) Obtaining "I" beams from blown bridge in Verdun for repair of RR
bridges. Transporting Signal equipment for RR cars at U278652 to XX Corps
Engr. Dp.
Co. C
Providing maintenance and security for treadway bridge
and approaches at U278703 and security for RR cars at U278652.
Water points (1) unit each operating at T380731 and T310779.
One (1) unit attached to 13th Replacement Battalion. |
|
| 7 September 1944 |
| ½ Mile SE of Jarny |
|
H&S Co.
Company performing usual Staff and Service functions.
Departed 1 mile SE of Nizeville at 0745 hours by motor convoy and arrived
½ mile South of Jarny at 2100 hours.
Co. A
Left 1 mile SE of Nizeville at 0800 hours by motor convoy
and arrived 2 miles SE of Jarny at 2000 hours. Morale Excellent. 1 squad
cleared vehicles from Route N-53 between Mars and Bexreix.
Co. B
Departed area 2 miles NE of Souhesmes at 0745 hours by
motor convoy and arrived at area ½ mile SE of Jarny at 2100 hours.
Assigned mission of building Treadway bridge at Dornot.
Co. C
Moved by motor convoy from Charny at 0700 hours and arrived
at Jarny 2100 hours. Removing mines from town of Cores and route to Dornot.
Battalion assigned to XII Corps and attached to 35th
division. |
|
| 8-9 September 1944 |
| 1 ½ Miles SW of Bonnet |
|
H&S Co.
Staff and Service functions. Departed area ½ miles
SE of Jarny at 0830 hours by motor convoy and arrived at new area 1 ½
miles SE of Bonnet by motor convoy at 1415 hours and arrived 2 miles SW
of Blenod at 1545 hours.
Co. A
Departed ½ mile South of Jarny at 2030 hours by
motor convoy, destination 1 ½ mile SW of Bonnet. Convoy enroute
at 2400 hours. Arrived 1 ½ miles SW of Bonnet at 0530 hours, left
at 1400 hours and arrived 2 miles West of Blenod-Les-Toul at 1700 hours.
Co B
Departed area ½ mile SE of Jarny at 1515 hours
by motor convoy and arrived at Chambley at 1630 hours. Departed from Chambley
at 1330 hours by motor convoy and arrived at area 1 ½ mile NE of
Blenod-Les-Toul at 2230 hours. Construct heavy Ponton bridge near Dornot,
Near city of Metz.
Co. C
Made assault crossing of Moselle River. Mission being
completed and company was relieved of assignment at 0300 hours 9 Sept.
44. 9 assault boats were lost, 3 men killed, 12 wounded in action. Clearing
mines and ferrying Infantry across Moselle River. |
|
| 9-10 September 1944 |
| 1 ½ Mile SW of Bonnet |
|
H&S Co.
Staff and Service functions. Arrived 1 ½ miles
SW of Bonnet by motor convoy at 0500 hours. Departed same by motor convoy
at 1415 hours and arrived 2 miles SW of Blenod-Les-Toul at 1545 hours.
Co. A
Resting and cleaning equipment. Arrived 1 ½ miles
SW of Bonnet by motor convoy at 0530 hours. Left same at 1400 hours and
arrived 2 miles West of Blenod-Les-Toul at 1700 hours.
Co. B
Resting and cleaning of equipment. Departed Chambley
at 1330 hours by motor convoy and arrived 1 ½ miles NE of Blenod-Les-Toul
at 2230 hours.
Co C
Departed ½ mile South of Jarny by motor convoy
at 1800 hours enroute to destination 2 miles South of Blenod-Les-Toul.
Battalion waiting and resting for further orders. |
|
| 10-11 September 1944 |
| 1 ½ Mile SE of Benny |
|
H&S Co.
Remained in area 1 ½ mile SW of Blenod-Les-Toul
until 1405 at which time they departed by motor convoy and arrived 1 ½
mile SE of Benny at 1540 hours. Mag. Center, and S-2 and S-3 left area
1 ½ mile SW of Blenos-Les- Toul as advance C.P. at 2000 hours and
arrived at Benny at 0300 hours.
Co. A
Left 2 miles West of Blenod-Les-Toul at 2035 hours by
motor march, destination 1 Mile East of Ormes-Et-Ville, Convoy enroute
at 2400 hours. Arrived 1 mile East of Ormes-Et-Ville at 0330 hours.
Co. C
Departed 2 miles SW of Blenod-Les-Toul by motor convoy
at 2045 hours enroute to destination 2 miles South of Benny. Arrived at
area 2 miles South of Benny at 0330 hours.
Med Det.
Departed from previous location at 2030 hours by motor
march and arrived at area 1 ½ mile SE of Benny at 0300 hours.
Battalion mission was to force two crossings of the Moselle
River in vicinity of Crevechamps. Sites were know as A, B & C Site.
A & C site to be treadway bridge with priority to
C Site. B site was to be Infantry foot bridge. A Company and B Company
were engaged in the construction of this mission. Co. C providing security
with assistance of the 137th Infantry Regt. Company B had 5
men wounded and 2 men from Med. Det. Wounded. |
|
| 11-12 September 1944 |
| 1 ½ Mile SW of Benny |
|
H&S Co.
Staff and Service functions.
Co. A
Was assigned the mission of ferrying Infantry across
Moselle River vicinity of Crevechamps.
Co B
Mission was to ferry Infantry across the Moselle River
in the vicinity of Crevechamps, also cleared all approaches in the vicinity
of both bridgeheads of mines.
Co. C
Constructed 130' foot bridge 2 miles South of Crevechamps
at Neuviller-Sur-Moselle. On 12 September, 44 we completed 160' Treadway
bridge, this was the first bridge across the Moselle River. |
|
| 13 September 1944 |
| 1 ½ Mile SW of Benny |
|
H&S Co.
Staff and Service functions.
Co. A
Completed Treadway bridge (372 ft. long) across Moselle
River at 1200 hours.
Co. B
2nd Platoon constructed Bailey bridge over
Canal near Crevechamp. Remainder of Company resting in Bivouac area.
Co. C
Third platoon maintained bridge and approaches at Neuviller
SW of Moselle. Remainder of Company in Bivouac area resting. |
|
| 14 September 1944 |
| ½ Mile East of Ferrieres |
|
H&S Co.
Departed 1 ½ mile SE of Benny at 1300 hours by
motor convoy and arrived 1 mile East of Ferrieres at 1500 hours.
Co. A
1st and 3rd platoons waiting to
support the 60th Engrs on an assault crossing of the Meurth
River, near Resiers. Left 1 mile East of Ormes-Et-Ville at 1300 hours by
motor march and arrived ½ mile South of Ferrieres at 1430 hours.
Co. B
Departed area 1 mile SE of Benny at 1300 hours and arrived
Ferrieres at 1430 hours. No operations for the day.
Co. C
Disassembled treadway bridge at Neuviller-Sur-Moselle.
Departed 2 miles South of Benny at 1300 hours and arrived at Ferrieres
at 1530 hours.
Med. Det.
Departed from 1 mile SE of Benny at 1330 hours by motor
convoy and arrived ½ mile SE of Ferrieres at 1500 hours. |
|
| 15 September 1944 |
| 3/4 Mile NW of Rosieres |
|
H&S Co.
Departed ½ Mile East Ferrieres at 1030 hours by
motor convoy and arrived 3/4 mile NW of Resieres at 1130 hours.
Co. A
Left ½ Mile South of Ferrieres at 1430 hours by
motor march and arrived 1 mile SW of Roseires at 1630 hours.
Co. B
Departed Ferrieres at 0830 hours by motor convoy and
arrived at area 1 mile SW of Rosieree-aux Sahmes at 0930 hours.
Co. C
Departed f rom Ferriers by motor convoy at 1300 hours
enroute to destination 2 miles West of Nancy.
Med. Det.
Departed 1 mile SE of Ferrieres at 0600 hours by motor
convoy and arrived 1 mile SW of Rosieres at 0700 hours. |
|
| 16 September 1944 |
| 3/4 Mile NW of Rosieres |
|
H&S Co.
Staff and Service functions.
Co. A
Support of 137th Infantry. Made assault crossing
across Meurth River near Laneuville. No casualties. One(1) 2 ½ ton
truck turned over in canal near Fleville. One man bruised slightly. Two
(2) Battalions of Infantry crossed on assault crossing.
Co. B
Rcn for and acquisition of bridge materials between St.
Nicholas and Rosieres. 1st Platoon repaired road near Fleville.
2nd squad, 3rd platoon alerted to clear mines at
Varageville.
Co. C
Construction of Class 70 Bailey bridge across canal in
Nancy. Construction of Class 40 treadway bridge across Meurthe River at
Nancy. |
|
| 17 September 1944 |
| 3/4 Mile NW of Rosieres |
|
H&S Co.
Staff and Service functions.
Co. A
Support of 137th Infantry crossing of Meurthe.
2nd and 3rd platoons removed mines from streets at
Art-Sur-Muerthe, 1 squad maintenance of treadway bridge.
Co. B
1st platoon repair and maintenance of canal
crossing. 1 squad removed mines from streets at Art-Sur-Muerthe.
Co. C
Construction of class 40 treadway bridge at Nancy. Maintenance
of 4 bridges at Nancy. On the night of 17 Sept. Co. C slept in beds in
a German hospital which use to be a French professional school before the
war in Nancy. |
|
| 18 September 1944 |
| 1 Mile South of Moncel |
|
H&S Co.
Departed 3/4 mile NW of Rosieres by motor convoy at 1810
hours and arrived 1 mile South of Moncel at 2130 hours.
Co. A
Removal of mines from streets at Art-Sur-Muerthe, maintenance
of treadway bridge. Left 1 mile SW of Rosieres at 1800 hours by motor march
and arrived ½ mile North of Sornville at 2100 hours. Operated with
battalion moving to new destination.
Co. B
Repair and maintenance of canal crossing, removal of
mines from streets at Art-Sur-Muerthe till relieved. Departed area 1 mile
SW of Rosieres at 1800 hours by motor convoy and arrived at area 1 mile
North of Sorneville at 2100 hours. Usual camp duties performed.
Co. C
Departed from Nancy by motor convoy at 1100 hours arrived
3/4 mile NnW of Rosieres at 1601 hours. Departed from Rosieres at 1830
and arrived ½ mile South of Mazerulles at 2200. 2nd platoon
maintaining three bailey bridges (300 ft. long) also clearing mines in
vicinity of Nancy.
Med. Det.
Departed 1 mile SW of Rosieres at 1800 hours by motor
march and arrived 1 mile South of Moncel-Sur-Seille at 2200 hours.
Battalion attached to 4th Armored Division
- To be close support of 4th Armored Division. |
|
| 19 September 1944 |
| 1 Mile South of Chateau-Salins |
|
H&S Co.
Staff and Service functions. S-1, S-2, and S-3 forward
echelon.
Co. A
To perform Engineer tasks in support of North column,
area of 4th Armored Division. Removal of obstacles in Chateau
Salins, 2nd platoon of Co. A left ½ mile North of Sorniville
at 0930 hours by motor march and arrived 1 mile South of Chateau Salins
at 1035 hours. Morale excellent.
Co. B.
To perform Engineer tasks in support of South column,
area of 4th Armored Division. Departed area 1 mile North of
Sorneville and arrived at area ½ mile North of Fresnes-Saulnois
at 1715 hours.
Co. C
Maintenance of 4 bridges in the vicinity of Nancy. 2nd
platoon removed obstacles from MSR, Route N-74. Departed from ½
mile South of Mazerulles by motor convoy at 1000 hours and arrived at ½
miles West of Salina at 1030 hours. 1st squad of 1st
platoon did some mine sweeping in vicinity of Salins. Rest of Company stood
by for assignment. |